Hakone Tozan Railway
- Visit: 40 min
Sign up free — See who's going and message them.
About
Hakone Tozan Railway climbs from Odawara to Gōra through Fuji-Hakone-Izu National Park in Hakone, Japan.
More photos 2
1 / 2Shorts
-
Hakone Tozan Cable Car - Japan’s Oldest Mountain RailwayJust Travel Updates
-
Tozan Railway in Hakone japans oldest mountain railwaysNewCityWalks
-
📍 Hakone Tozan Railway – Hakone, Japan 🚂 In 1919, Japan built its fir…Rangeless
-
Hakone Tozan Railway, JapanRaveeVlogs
-
Riding the Hakone Tozan Railway: Full Zigzag Switchback at Deyama Sig…TrainsChaser
-
Hakone Tozan Train | Japan’s Mountain RailwayEveryday Japan Wonders
-
Hakone Tozan RailwayBayasaa Marshall
-
The Hakone Tozan Train 🚞 | Japan’s Steep Mountain Railway from Hakone…Billy Taph
Why go
- Three switchbacks at Deyama, Kami-Ōhiradai and Sennindai, where trains reverse direction.
- Hayakawa Bridge, 43 m above the river, followed by a near 180° turn through two tunnels.
What you see
- The Haya-kawa River below the route, with bridges and tunnels from the early twentieth century, including Deyama Bridge, 43 m high.
Best time to visit
- June and July, when hydrangeas bloom along the route; some are illuminated for evening trains.
History
Support for a mountain railway followed, modeled on Switzerland’s Bernina Railway. The Hakone-Yumoto–Gōra section opened in 1919.
- 1888A horse-drawn line began running from Kōzu via Odawara to Hakone-Yumoto.
- 1900The line was electrified and began operating as a tramway.
- 1907Inoue Kaoru and Mitsui chairman Masuda Takashi supported the mountain railway project.
- 1912The mountain section was modeled on Switzerland’s Bernina Railway.
- 1919The mountain railway opened between Hakone-Yumoto and Gōra.
Show all
- 1924Reconstruction of the line was completed on 28 December.
- 1948Odakyū Dentetsu took over the railway company.
- 1950Through services between Tokyo and Hakone began.
How to get there
- 15 minTrainTake the Odawara–Hakone-Yumoto section, then change trains at Hakone-Yumoto for Gōra.
- 40 minTrainThe mountain section runs from Hakone-Yumoto to Gōra.
- Cable carAt Gōra, transfer to the Hakone Tozan Cable Car.
Sources: Hakone Tozan Line - Wikipedia · Hakone-Tozan-Linie - Wikipedia · Ligne Hakone Tozan - Wikipedia · checked 27 Oct 2026
Where
Hakone machi
Plan from here: Evening walk →
Questions and answers
How long does the Hakone Tozan Railway ride to Gōra take?
The mountain section from Hakone-Yumoto to Gōra takes about 40 minutes.
How do I get to Gōra on the Hakone Tozan Railway from Odawara?
Take a train from Odawara to Hakone-Yumoto, then change trains for Gōra. The first section takes about 15 minutes; the mountain section takes about 40 minutes.
How invme works
- See who's going — faces, not ticket counts.
- Write to someone who shares your interests — no swipes, no matches, no paywall.
- Pick the event or the place to meet at — and go together.
Reviews on invme
Sign in to reviewLoading comments…





