Itaipu Dam
Sign up free — See who's going and message them.
About
More photos 7
1 / 7Why go
- Technical tours inside the dam wall and the turbines, running since 2005.
- The dam wall, 196 metres high, about the height of a 65-storey building.
- The reservoir behind the dam, about 170 km long, from Foz do Iguaçu to Guaíra.
Opening hours
Today08:30 – 19:00Show all
Don't miss
- The spillwayIt can pass 62,200 cubic metres of water per second, 40 times the average flow of the Iguaçu falls.It is part of the dam across the Paraná River. On the map
- The generating unitsTwenty units of 700 MW each. Ten run at 50 Hz for Paraguay and ten at 60 Hz for Brazil. A treaty caps running units at 18, so two stay stopped for maintenance.Inside the dam, where the technical tours go. On the map
Know before you go
- Visitor hours: Monday to Thursday and on Sunday, 08:30 to 16:00.
- Visitor hours: Friday and Saturday, 08:30 to 19:00.
Tips for your visit
- The address is Avenida Tancredo Neves, 6702, Foz do Iguaçu.
- A second visitor centre is at Hernandarias, north of Ciudad del Este.
Interesting facts7
Shorts
-
⚡ 𝐈𝐭𝐚𝐢𝐩𝐮 𝐃𝐚𝐦 [[𝐇𝐲𝐝𝐫𝐨 𝐆𝐢𝐚𝐧𝐭 𝐑𝐞𝐯𝐞𝐚𝐥𝐞𝐝]]CrazyMyWorld
-
#itaipu dam#largest#hydroelectric complexRevvai
-
Itaipu Dam Brazil | exploring best dams on vacation | best dams viewYEY HO
-
The Itaipu Dam‼Top Line
-
Generator caps at Itaipu Dam, Parana State, BrazilJerry Hearts To Travel
-
A turbine in the Itaipu dam on the Brazil-Paraguay border.Larry Meuwissen
-
Itaipu Dam — Megastructure That Powers Two CountriesWide Angle Views
-
Itaipu Dam: The Mega Project You Need to See!From Nothing to Survive
History
Brazil and Paraguay built the dam together on the Paraná River while both countries were under military rule. The project cost about 19.6 billion dollars, and about 34,000 workers were employed on the site. The reservoir permanently flooded the Sete Quedas falls near Guaíra. About 40,000 people, mostly Guaraní, had to be resettled. During the construction work, 145 people died.
- 1973Brazil and Paraguay sign the Itaipu treaty.
- 1975Construction work starts on the site.
- 1978The Paraná River is diverted so part of its bed can be dried out for the dam.
- 1982The reservoir begins to fill once the dam works are finished.
- 1984The first generating unit enters service.
Show all
- 2005Total capacity reaches 14 GW.
- 2007Lula da Silva declares the project finished.
- 2016The plant sets a production record of 103 TWh.
Sources: Itaipu Dam - Wikipedia · Itaipú - Wikipedia · Barrage d'Itaipu - Wikipedia · checked 17 Oct 2026
Questions and answers
What are the opening hours of Itaipu Dam?
Visitors can come from 08:30 to 16:00 on Monday to Thursday and on Sunday. On Friday and Saturday the hours run until 19:00.
How do I get to Itaipu Dam from Foz do Iguaçu?
Bus tours to the dam run from a visitor centre on the edge of Foz do Iguaçu. The dam's address is Avenida Tancredo Neves, 6702, Foz do Iguaçu.
Can visitors go inside Itaipu Dam?
Yes. Technical tours take visitors inside the dam wall and to the turbines, and have run since 2005.
Is there a second visitor centre for Itaipu Dam?
Yes. The second visitor centre is at Hernandarias, north of Ciudad del Este.
- See who's going — faces, not ticket counts.
- Write to someone who shares your interests — no swipes, no matches, no paywall.
- Pick the event or the place to meet at — and go together.












1984
2013
380 Eiffel