Peak 2 Peak Gondola

Cable cars & funiculars ·Whistler ·Open now
4.79.0K
#4Things to do in WhistlerTravelers' Choice 2026
  • Visit: 11 min

Sign up free — See who's going and message them.

About

Peak 2 Peak Gondola links two mountain lodges in Whistler, British Columbia, Canada, as North America’s first Doppelmayr 3S lift.

More photos 11

1 / 11
Peak 2 Peak Gondola — Gondola terminals and cable route across the mountain valleyPeak 2 Peak Gondola — Red gondola cabin passing a steel tower above the cloudsPeak 2 Peak Gondola — Red Peak 2 Peak cabin beside the support structurePeak 2 Peak Gondola — Gondola tower rising against a clear blue skyPeak 2 Peak Gondola — Steel gondola tower among mountain trees beneath overcast skiesPeak 2 Peak Gondola — Gondola tower and cabins above a forested slopePeak 2 Peak Gondola — Red cabin travelling over a deep green mountain valleyPeak 2 Peak Gondola — Red gondola cabin seen through a snowy window openingPeak 2 Peak Gondola — Gondola shadow stretching across a dense forest canopyPeak 2 Peak Gondola — Mountain panorama and gondola route above the forested ridgePeak 2 Peak Gondola — Gondola line crossing a snow covered alpine mountainside

Opening hours

Today08:30 – 15:00Show all
Monday08:30 – 15:00
Tuesday08:30 – 15:00
Wednesday08:30 – 15:00
Thursday08:30 – 15:00
Friday08:30 – 15:00
Saturday08:30 – 15:00
Sunday08:30 – 15:00

Shorts

Why go

  • Two blue cabins have glass floors for views into the valley.
  • The 4.4-kilometre journey across the Fitzsimmons Creek valley takes 11 minutes.
  • Cabins reach 436 metres above the ground, the highest point above ground of any gondola.
  • Its 3.03-kilometre unsupported span held the world record until 2017.
  • Its two terminals are the world’s largest lift terminal buildings.

Season and conditions

  • The gondola carries skiers in winter and sightseers year-round.

History

Doppelmayr Garaventa built the gondola in 2007–2008 for CDN$51 million. Steve Podborski hosted the opening ceremony, which featured BASE jumps by Red Bull Air Force members.

  1. 1997Hugh Smythe and Paul Mathews proposed a ropeway link after visiting Zermatt.
  2. September 19, 2005The gondola project was announced.
  3. May 21, 2007Construction began with a groundbreaking ceremony.
  4. December 12, 2008The gondola opened, becoming the first lift between the two mountains and eliminating skiers’ descent to the resort base when changing sectors.

How to get there

  • CarAddress: 4545 Blackcomb Way, Whistler, British Columbia.

Sources: Peak 2 Peak Gondola - Wikipedia · Peak 2 Peak Gondola - Wikipedia (part 2) · Peak 2 Peak Gondola - Wikipedia · Peak 2 Peak - Wikipedia · checked 28 Sep 2026

Where
4545 Blackcomb Way, Whistler

Plan from here: Evening walk →

Questions and answers

What are the Peak 2 Peak Gondola’s opening hours?

Daily, 08:30–15:00.

How many people fit in a Peak 2 Peak Gondola cabin?

Up to 28: 22 seated and six standing.

What type of cableway is the Peak 2 Peak Gondola?

It is a 3S tri-cable lift, the first of its kind from Doppelmayr in North America.

What wind speeds is the Peak 2 Peak Gondola designed for?

It is designed to operate in winds up to 80 kilometres per hour.

Does the Peak 2 Peak Gondola have backup power?

An auxiliary diesel engine can run the lift if its main engine fails or power is lost.

How invme works
  1. See who's going — faces, not ticket counts.
  2. Write to someone who shares your interests — no swipes, no matches, no paywall.
  3. Pick the event or the place to meet at — and go together.
Join free

Reviews on invme

Sign in to review
Loading comments…